2001
  • Created the standard and protocol for the EFVM® test.
  • Began rigorous compatibility benchmarking to confirm suitable membranes. Testing continues to this day.
  • Introduced the EFVM® test to the North American roofing market.
2002
  • Demonstrated the superior EFVM® results on a plaza deck that had previously passed a flood test
  • Leading waterproofing membrane manufacturer accepted the EFVM® test as an acceptable alternative to the standard flood test requirement
  • Leading single ply membrane manufacturer accepted the EFVM® test method and results to provide extended membrane warranty
  • Introduced the permanent installation of the Vector-9 conductor wire on roofing and waterproofing projects to allow for future testing and monitoring of the membrane
  • Developed EFVM® accessories enhancing the EFVM® test
  • Introduced a conductive medium on wood deck structures to allow testing for non-conductive structural decks
2003
  • Completed testing 1,000,000 square feet of membrane installations
  • Leading roofing membrane manufacturers retained ILD®’s EFVM® technique as a trouble shooting tool on existing roof systems
2004
  • Completed testing 2,500,000 square feet of membrane since introducing the EFVM® test to North America
  • EFVM® test utilized on Canada’s largest green roof project to date: The Ottawa War Museum (170,000 square feet)
2005
  • Completed testing of membrane installations reached 4,000,000 square feet.
2006
  • Completed testing of membrane installations reached 6,000,000 square feet.
  • Introduced a conductive medium on a conventional insulated roof systems to enhance the EFVM® test on a large green roof project in order to eliminate the flood test requirement
  • International Leak Detection’s European associates applied for world patent on a conductive medium system ProtectSys®
2007
  • Along with a large roofing manufacturing company, developed and participated in a test market program across select North American cities to demonstrate the benefits of EFVM®.
  • Tested in excess of 10,000,000 square feet of membrane since introducing the EFVM® test to the North American market
  • International Leak Detection and its world wide associates surpassed 100,000,000 square feet of membrane testing worldwide
2008
  • EFVM® test utilized on Canada’s largest green roof project to date: The Vancouver Convention Centre (300,000 square feet)